CONSTRUCTION

Coming soon

Quantity surveying on the laptop.

For SEQ builders who price their own work. Survey in, measured bill out. SEQ rates and gazetted council fees on the drawing set. Not live yet — on its own, or inside the Property Developers package.

A house frame at dusk

01

Survey to BOQ

Trade-break takeoff from the job survey, gazetted SEQ council fees, and the code pack. Lock, edit, add after it lands.

02

From the drawings

Marlwood Foundation FND-3.4 reads the uploaded set with the survey, then writes labour, plant, material and authority lines.

03

SEQ rate library

FY 2026–27 drafting rates for the trades a SEQ builder actually prices. Override on the survey.

04

Site file is law

Party register, current versus superseded drawings, subcontractor induction, timesheet labour, invoice mailbox.

05

Claims and bank

Progress claims, variations, certificates. Match the feed. Do not pay until the clock and the invoice agree.

06

Job classes

Renovation through Class 1a, subdivision, townhouses, apartments, commercial, fit-out.